Petra - First to know

Relatively cloudy
Amman
17°C
Dark Mode Light Mode
Today’s Breaking News
rows
العربية

Relatively cloudy

Amman

17°C

  • Search
  • News Archive
  • Week’s News
  • Sitemap
The Jordan News Agency
The Jordan News Agency
Today’s Breaking News
AR
  • General Bulletin
  • Business & Economy
  • Local News
  • Governorates
  • World News
  • Photo Albums
  • About Petra
    1. News Archive
    2. Week’s News
    3. Sitemap
| rows
  • Cabinet Honors Victims of Karak Terror Attack at Start of Sunday Session

  • PM Attends Funeral of Karak Terrorist Attack Victims

  • King receives call from Lebanon president

  • Terror Attack Perpetrators Will Not Escape Punishment: Government Communication Minister

Preparing print…

Business & Economy

  1. Home Page
  2. Business & Economy
  3. Abu Khashiba Copper Project Advances as Studies Identify Up to 20.9 Million Tons of Ore

Abu Khashiba Copper Project Advances as Studies Identify Up to 20.9 Million Tons of Ore

19/10/2026 | 15:48:08

  • site.twitter
  • site.copy
  • site.share
  • site.print
  • site.TextAa
  • site.TextAa
Abu Khashiba Copper Project Advances as Studies Identify Up to 20.9 Million Tons of Ore

Amman, Oct. 19 (Petra) -- Preliminary studies of the Abu Khashiba copper mining project in southern Jordan have identified mineral resources estimated at between 9.4 million and 20.9 million tons of ore, depending on the assessment method, as exploration continues and work progresses on a pilot processing plant.

The figures were presented Monday during a field visit by Minister of Energy and Mineral Resources Saleh Kharabsheh and members of the energy and mineral resources committees of the Senate and Lower House to the project, which is being developed by Wadi Araba Minerals Company.

The visit began with a technical briefing at the company's field camp, covering geological studies, exploration and drilling results, mineral resource estimates, and plans to develop the project and establish processing facilities for copper and associated minerals.

Kharabsheh described Abu Khashiba as a promising strategic mining project that could help Jordan make greater use of its mineral resources, increase the mining sector's contribution to gross domestic product, attract investment and create jobs in line with the Economic Modernization Vision.

He highlighted the project's potential economic returns, including government revenues, direct and indirect employment, and increased activity in mining-related industries and services, particularly in southern Jordan.

The minister stressed the importance of progressing systematically from exploration to mineral resource assessment, economic feasibility studies and eventual commercial production, in accordance with internationally recognized scientific and technical standards.

He said the copper exploration and development agreement signed with Wadi Araba Minerals Company was the first of its kind in Jordan, emphasizing the need to continue exploration and development activities under the implementation agreement and approved work plans.

Wadi Araba Minerals Company General Manager Hani Asmar presented the results of the company's technical work, including geological, geochemical and geophysical surveys, remote sensing, trenching, exploratory drilling, laboratory analysis and metallurgical testing to assess copper and gold mineralization.

Asmar said the company's internal assessment estimated approximately 20.9 million tons of ore with an average copper grade of 0.38%, while an independent technical assessment estimated 9.4 million tons at an average grade of 0.50%, equivalent to approximately 46,000 tons of copper.

He explained that the figures reflect current study results and that drilling has so far covered only an initial portion of the basin's copper-bearing areas, leaving opportunities for further exploration and revisions to resource estimates as additional drilling data become available.

Since the implementation agreement took effect in May, the company has advanced its exploration program. Work reported for October includes analysis of 659 geochemical samples, excavation of 53 exploration trenches, drilling of 65 boreholes, and laboratory and metallurgical tests using different extraction and leaching techniques. Asmar said the next phase will extend over 24 months and include drilling more than 120 exploratory boreholes using diamond core drilling techniques.

The program aims to expand the areas studied, improve three-dimensional geological models and increase confidence in mineral resource classifications, ultimately supporting preparation of a definitive feasibility study.

He added that the company is developing a pilot-scale copper ore processing plant to test the ore's technical and metallurgical characteristics, evaluate processing and extraction efficiency, and generate operational data for designing a future commercial production facility.

Preliminary metallurgical tests have produced encouraging results for copper extraction from oxidized ores, particularly copper-bearing minerals such as malachite and chrysocolla.

Some laboratory tests achieved extraction rates exceeding 99% under specific operating conditions, Asmar said, noting that larger-scale testing remains necessary to verify processing efficiency and economic feasibility.

The company has also identified sites containing copper ore suitable for initial extraction, with preliminary estimates indicating approximately 400,000 tons of ore at an average copper grade of around 1%. Asmar said these resources could provide an initial basis for studying pilot operations and potential future expansion.

During the tour, the minister and parliamentary delegation inspected construction work at the pilot processing plant, including planned ore stockpiling areas and proposed processing units. They were briefed on the technical and economic objectives of the pilot production phase.

The delegation also visited exploration drilling sites in sectors 2 and 3, where members examined diamond core drilling operations and extracted samples and received explanations of the area's mineralization, geological structures and ongoing exploration programs.

The company also presented preliminary projections of the project's economic returns, including government revenues from taxes and other financial contributions.

According to the company's initial estimates, the government's share of total profits could range from 48% to 50%. The company stressed that these projections depend on assumptions about production, prices and costs and will be revised following the completion of final feasibility studies.

Asmar reaffirmed the company's commitment to working with local communities by providing training and employment opportunities, supporting local suppliers and service providers, and complying with environmental sustainability and social responsibility requirements.

Senate Energy Committee Chair Farouk Hiyari, for his part, stressed the importance of expanding mining investment across Jordan. He said the visit was intended to assess progress on the ground and review the latest copper and gold exploration activities undertaken by Wadi Araba Minerals Company.

Hiyari added that developing the mining sector supports the Economic Modernization Vision's priorities of increasing value added from mineral resources, expanding extractive industries and stimulating economic growth.

//Petra// AJ

  • site.twitter
  • site.copy
  • site.share
  • site.print
  • site.TextAa
  • site.TextAa

Topics:

  • Business & Economy

Live News Feed

Trade Deficit Shrinks 9.6% as Exports Surge Through August

25/10/2026 | 16:26:22

Princess Basma Calls for Innovation to Strengthen Food Security

25/10/2026 | 16:22:53

Licensed Building Area Rises 5.7% in First Eight Months of 2026

25/10/2026 | 16:13:06

Minister Orders Streets Named After Karak Terror Attack Victims

25/10/2026 | 16:02:54

Jordan Embassy in Washington Holds Vigil for Karak Church Attack Victims

25/10/2026 | 15:48:40

Arab Women Engineers Discuss Planning Resilient, Sustainable Cities in Salt

25/10/2026 | 15:42:34

More Of Business & Economy

Trade Deficit Shrinks 9.6% as Exports Surge Through August

Trade Deficit Shrinks 9.6% as Exports Surge Through August

25/10/2026 | 16:26:22
Licensed Building Area Rises 5.7% in First Eight Months of 2026

Licensed Building Area Rises 5.7% in First Eight Months of 2026

25/10/2026 | 16:13:06
ASE Down 0.52% with JD15M Trading

ASE Down 0.52% with JD15M Trading

25/10/2026 | 14:55:27

CRIF Jordan signs agreement to expand credit information services

25/10/2026 | 14:50:25

Kenya Offers Promising Export Opportunities for Jordanian Fertilizers, Chemicals, Study Finds

25/10/2026 | 14:41:26

Jordan-EU Conference: A Gateway for Sustainable Investment and Regional Growth

25/10/2026 | 12:21:59

Anchored in Resilience: How Jordan’s Economy Navigates Regional Turbulence

25/10/2026 | 10:37:16

JSMO Adopts International Standards for Office Equipment Accessibility, Educational Management Systems

25/10/2026 | 10:22:56
  • Need a little help?

    To adjust this website for your accessibility needs, select one or more options below.

    Invert Colors
    Invert Colors
    Invert Colors Invert Colors
    Dark Contrast Dark Contrast
    Desaturated Desaturated
    Highlight Links Highlight Links
    Highlight Links Highlight Links
    Text Spacing Text Spacing
    Light Spacing Light Spacing
    Moderate Spacing Moderate Spacing
    Heavy Spacing Heavy Spacing
    Font Size Font Size
    site.INCREASE_FONT_SIZE A
    site.INCREASE_FONT_SIZE A+
    site.INCREASE_FONT_SIZE A++
    site.FONT_TYPE Font Type
    Dyslexia Friendly Dyslexia Friendly
    Legible Font Legible Font
    Reading Reading
    Big Cursor Big Cursor
    ٍReading Cursor ٍReading Cursor
    Reading Guide Reading Guide
    Line Height Line Height
    Line Height (0.75) Line Height (0.75)
    Line Height (1.75) Line Height (1.75)
    Line Height (2) Line Height (2)
    Text Align Text Align
    Align Right Align Right
    Align Left Align Left
    Align Center Align Center
    Justify Text Justify Text
    Reset All
    site.ACCESSIBILITY_TOOL
  • rows
  • rows
  • rows
footer
footer
footer
Sanad Your service is our duty The right to obtain information Invest in Jordan footer-second-row-images-en Amman Message
  1. Sanad

  2. Your service is our duty

  3. The right to obtain information

  4. Invest in Jordan

  5. Amman Message

Main

  • Business & Economy
  • Local News
  • Governorates
  • World News
  • Photo Albums

About Petra

About Jordan

  • Official website of the Royal Hashemite Court
  • Official website of His Majesty King Abdullah II
  • Official website of His Royal Highness Crown Prince Al Hussein bin Abdullah II
  • Official website of Her Majesty Queen Rania Al Abdullah
  • Useful Link

Contact us

  • Phone

    +962 (6) 5609700
  • Fax:

    +962 (6) 5682493
  • PO BOX:

    6845 Amman 11118
  • Email:

    petra@petra.gov.jo
  • Address:

     Jamal Abdel-Naser Circle
  • rows

Download Application

  • Supports Internet Explorer 10+, Google Chrome, Firefox, Safari
  • This website is best viewed on a 768 x 1366 screen
  • Program required for browsing: Adobe Reader
  • Privacy Policy
  • Copyright
  • Terms of Use
  • Disclaimer
  • Cookies

All rights protected by - Petra News Agency 1997 - 2026 © Developed by dot.jo